Files
tutor-service/.planning/v1-MILESTONE-AUDIT.md
2026-04-26 18:00:59 +09:00

5.9 KiB

milestone, audited, status, scores, gaps, tech_debt, nyquist
milestone audited status scores gaps tech_debt nyquist
v1 2026-04-26 tech_debt
requirements phases integration flows
28/28 6/6 6/6 2/2
requirements integration flows
phase items
001-go-backend-foundation-and-workflow-boundary
Workflow runner is still a deterministic stub; real third-one/agent-farm runtime is deferred.
Persistence, auth, frontend, ontology, and asset generation were deferred from the foundation phase.
phase items
002-diagnostic-interview-loop
Diagnostic sessions are in-memory and lost on process restart.
Real third-one grading calls are deferred.
phase items
003-learner-memory
Learner memory is in-memory.
Memory decay, ranking, and repeated-mistake clustering are deferred.
phase items
004-progression
Readiness history, campaign state, and streak persistence are deferred.
Boss unlocks use simple stable-count logic rather than a richer concept cluster graph.
phase items
005-ontology-materials
Material ingestion accepts JSON text only; multipart/PDF/PPT parsing is deferred.
Ontology analyzer is deterministic and shallow.
Human review and graph database persistence are deferred.
phase items
006-teaching-assets
Prompt candidates are generated, but real image generation is deferred.
gpt-image-v2 is a product config key; actual provider model id must be verified before production calls.
Binary asset storage and slide/PPT export are deferred.
compliant_phases partial_phases missing_phases overall
001-go-backend-foundation-and-workflow-boundary
002-diagnostic-interview-loop
003-learner-memory
004-progression
005-ontology-materials
006-teaching-assets
missing

v1 Milestone Audit

Verdict

TECH_DEBT

All v1 functional requirements are satisfied and all phase verification reports are PASS. No critical requirement, integration, or end-to-end flow blocker was found.

The milestone should still be treated as a tech-debt review before archival because the v1 backend is intentionally MVP-scoped: in-memory stores, stubbed workflow execution, shallow deterministic ontology extraction, and prompt-only teaching assets.

Scope

Phase Name Verification
1 Go backend foundation and workflow boundary PASS
2 Diagnostic interview loop PASS
3 Learner memory PASS
4 Progression PASS
5 Ontology and learning materials PASS
6 Teaching assets PASS

Requirements Coverage

Requirement Group Count Status Evidence
BACK-01..BACK-05 5/5 Satisfied Phase 1 verification
INT-01..INT-06 6/6 Satisfied Phase 2 verification
MEM-01..MEM-05 5/5 Satisfied Phase 3 verification
PROG-01..PROG-05 5/5 Satisfied Phase 4 verification
ONTO-01..ONTO-04 4/4 Satisfied Phase 5 verification
ASSET-01..ASSET-03 3/3 Satisfied Phase 6 verification

Total: 28/28 v1 requirements satisfied.

Cross-Phase Integration

Flow Result Evidence
Diagnostic to learner memory to progression PASS Live smoke created a diagnostic session, submitted an answer, read learner memory, readiness map, and next challenge.
Material ingestion to ontology to teaching asset prompt PASS Live smoke ingested material, read ontology candidates, and generated a source-backed teaching asset prompt.
App wiring PASS internal/app/server.go wires workflow runner, interview service, learner memory, progression, ontology, and teaching assets into one HTTP handler.
Typed workflow boundary PASS State-changing workflow outputs use Go structs and evidence references; handlers do not parse shell output.
Source lineage PASS Ontology candidates and teaching asset prompts preserve source evidence and candidate review state.
Image model guard PASS Teaching asset prompts store model_key and keep requires_model_id_verification=true.

End-to-End Smoke Evidence

Latest audit smoke result:

{
  "SessionID": "diag-1",
  "AnswerGrade": "solid",
  "MemoryMastery": 1,
  "Readiness": 75,
  "ChallengeConcept": "http-idempotency",
  "MaterialID": "material-1",
  "OntologyConcepts": 4,
  "OntologyEdges": 3,
  "AssetPromptID": "asset-prompt-1",
  "AssetModelKey": "gpt-image-v2",
  "AssetRequiresVerification": true
}

Validation Evidence

  • go test ./... passed.
  • openspec validate bootstrap-job-tutor-platform --strict passed.
  • Go source line-count check passed; no manually authored Go file exceeds 600 lines.
  • Git worktree was clean before the audit began.

Requirement Cross-Reference Notes

The requirement checklist and phase verification reports agree: every v1 requirement is marked complete and has a matching PASS entry in the relevant phase verification file.

Phase summary files do not include YAML frontmatter with requirements-completed. This is not a product blocker because each summary has a matching verification report, but adding standardized summary frontmatter would make future automated audits cleaner.

Nyquist Discovery

No *-VALIDATION.md files were found for phases 1 through 6. This audit treats that as validation-process debt rather than a v1 product blocker because each phase already has a PASS verification report plus current tests and smoke coverage.

Choose one of these as the next milestone:

  • Frontend MVP: build the web experience on top of the completed backend flow.
  • Persistence: replace in-memory stores with durable storage and migration boundaries.
  • Real workflow runtime: connect the typed runner boundary to third-one and internalized agent-farm workflow execution.
  • Document parser integration: add PDF/PPT/slide/document ingestion before richer ontology work.