861 B
861 B
Phase 9 Context: Material and Asset Workspace
Status: Ready for execution Started: 2026-04-26
Goal
Expose material ingestion, ontology inspection, and teaching asset prompt candidate generation in the web app.
Requirements
- WEB-05: Operator can ingest source material from the web app.
- WEB-06: Operator can inspect ontology candidate concepts, edges, and gaps.
- WEB-07: Operator can generate and inspect teaching asset prompt candidates.
- WEB-08: Web UI includes loading, empty, and error states for the MVP flows.
UX Direction
Keep content operations as a secondary workspace below the diagnostic answer surface. The operator flow should show provenance and candidate status without turning the page into an admin dashboard.
Out of Scope
- Full ontology editor.
- Human review promotion controls.
- Actual image generation.