5.9 KiB
milestone, audited, status, scores, gaps, tech_debt, nyquist
| milestone | audited | status | scores | gaps | tech_debt | nyquist | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| v1 | 2026-04-26 | tech_debt |
|
|
|
|
v1 Milestone Audit
Verdict
TECH_DEBT
All v1 functional requirements are satisfied and all phase verification reports are PASS. No critical requirement, integration, or end-to-end flow blocker was found.
The milestone should still be treated as a tech-debt review before archival because the v1 backend is intentionally MVP-scoped: in-memory stores, stubbed workflow execution, shallow deterministic ontology extraction, and prompt-only teaching assets.
Scope
| Phase | Name | Verification |
|---|---|---|
| 1 | Go backend foundation and workflow boundary | PASS |
| 2 | Diagnostic interview loop | PASS |
| 3 | Learner memory | PASS |
| 4 | Progression | PASS |
| 5 | Ontology and learning materials | PASS |
| 6 | Teaching assets | PASS |
Requirements Coverage
| Requirement Group | Count | Status | Evidence |
|---|---|---|---|
| BACK-01..BACK-05 | 5/5 | Satisfied | Phase 1 verification |
| INT-01..INT-06 | 6/6 | Satisfied | Phase 2 verification |
| MEM-01..MEM-05 | 5/5 | Satisfied | Phase 3 verification |
| PROG-01..PROG-05 | 5/5 | Satisfied | Phase 4 verification |
| ONTO-01..ONTO-04 | 4/4 | Satisfied | Phase 5 verification |
| ASSET-01..ASSET-03 | 3/3 | Satisfied | Phase 6 verification |
Total: 28/28 v1 requirements satisfied.
Cross-Phase Integration
| Flow | Result | Evidence |
|---|---|---|
| Diagnostic to learner memory to progression | PASS | Live smoke created a diagnostic session, submitted an answer, read learner memory, readiness map, and next challenge. |
| Material ingestion to ontology to teaching asset prompt | PASS | Live smoke ingested material, read ontology candidates, and generated a source-backed teaching asset prompt. |
| App wiring | PASS | internal/app/server.go wires workflow runner, interview service, learner memory, progression, ontology, and teaching assets into one HTTP handler. |
| Typed workflow boundary | PASS | State-changing workflow outputs use Go structs and evidence references; handlers do not parse shell output. |
| Source lineage | PASS | Ontology candidates and teaching asset prompts preserve source evidence and candidate review state. |
| Image model guard | PASS | Teaching asset prompts store model_key and keep requires_model_id_verification=true. |
End-to-End Smoke Evidence
Latest audit smoke result:
{
"SessionID": "diag-1",
"AnswerGrade": "solid",
"MemoryMastery": 1,
"Readiness": 75,
"ChallengeConcept": "http-idempotency",
"MaterialID": "material-1",
"OntologyConcepts": 4,
"OntologyEdges": 3,
"AssetPromptID": "asset-prompt-1",
"AssetModelKey": "gpt-image-v2",
"AssetRequiresVerification": true
}
Validation Evidence
go test ./...passed.openspec validate bootstrap-job-tutor-platform --strictpassed.- Go source line-count check passed; no manually authored Go file exceeds 600 lines.
- Git worktree was clean before the audit began.
Requirement Cross-Reference Notes
The requirement checklist and phase verification reports agree: every v1 requirement is marked complete and has a matching PASS entry in the relevant phase verification file.
Phase summary files do not include YAML frontmatter with
requirements-completed. This is not a product blocker because each summary has
a matching verification report, but adding standardized summary frontmatter
would make future automated audits cleaner.
Nyquist Discovery
No *-VALIDATION.md files were found for phases 1 through 6. This audit treats
that as validation-process debt rather than a v1 product blocker because each
phase already has a PASS verification report plus current tests and smoke
coverage.
Recommended Next Milestone
Choose one of these as the next milestone:
- Frontend MVP: build the web experience on top of the completed backend flow.
- Persistence: replace in-memory stores with durable storage and migration boundaries.
- Real workflow runtime: connect the typed runner boundary to third-one and internalized agent-farm workflow execution.
- Document parser integration: add PDF/PPT/slide/document ingestion before richer ontology work.