Files
tutor-service/.planning/phases/009-material-asset-workspace/009-CONTEXT.md
2026-04-26 18:52:16 +09:00

861 B

Phase 9 Context: Material and Asset Workspace

Status: Ready for execution Started: 2026-04-26

Goal

Expose material ingestion, ontology inspection, and teaching asset prompt candidate generation in the web app.

Requirements

  • WEB-05: Operator can ingest source material from the web app.
  • WEB-06: Operator can inspect ontology candidate concepts, edges, and gaps.
  • WEB-07: Operator can generate and inspect teaching asset prompt candidates.
  • WEB-08: Web UI includes loading, empty, and error states for the MVP flows.

UX Direction

Keep content operations as a secondary workspace below the diagnostic answer surface. The operator flow should show provenance and candidate status without turning the page into an admin dashboard.

Out of Scope

  • Full ontology editor.
  • Human review promotion controls.
  • Actual image generation.