--- milestone: v1 audited: 2026-04-26 status: tech_debt scores: requirements: 28/28 phases: 6/6 integration: 6/6 flows: 2/2 gaps: requirements: [] integration: [] flows: [] tech_debt: - phase: "001-go-backend-foundation-and-workflow-boundary" items: - "Workflow runner is still a deterministic stub; real third-one/agent-farm runtime is deferred." - "Persistence, auth, frontend, ontology, and asset generation were deferred from the foundation phase." - phase: "002-diagnostic-interview-loop" items: - "Diagnostic sessions are in-memory and lost on process restart." - "Real third-one grading calls are deferred." - phase: "003-learner-memory" items: - "Learner memory is in-memory." - "Memory decay, ranking, and repeated-mistake clustering are deferred." - phase: "004-progression" items: - "Readiness history, campaign state, and streak persistence are deferred." - "Boss unlocks use simple stable-count logic rather than a richer concept cluster graph." - phase: "005-ontology-materials" items: - "Material ingestion accepts JSON text only; multipart/PDF/PPT parsing is deferred." - "Ontology analyzer is deterministic and shallow." - "Human review and graph database persistence are deferred." - phase: "006-teaching-assets" items: - "Prompt candidates are generated, but real image generation is deferred." - "gpt-image-v2 is a product config key; actual provider model id must be verified before production calls." - "Binary asset storage and slide/PPT export are deferred." nyquist: compliant_phases: [] partial_phases: [] missing_phases: - "001-go-backend-foundation-and-workflow-boundary" - "002-diagnostic-interview-loop" - "003-learner-memory" - "004-progression" - "005-ontology-materials" - "006-teaching-assets" overall: missing --- # v1 Milestone Audit ## Verdict TECH_DEBT All v1 functional requirements are satisfied and all phase verification reports are PASS. No critical requirement, integration, or end-to-end flow blocker was found. The milestone should still be treated as a tech-debt review before archival because the v1 backend is intentionally MVP-scoped: in-memory stores, stubbed workflow execution, shallow deterministic ontology extraction, and prompt-only teaching assets. ## Scope | Phase | Name | Verification | |-------|------|--------------| | 1 | Go backend foundation and workflow boundary | PASS | | 2 | Diagnostic interview loop | PASS | | 3 | Learner memory | PASS | | 4 | Progression | PASS | | 5 | Ontology and learning materials | PASS | | 6 | Teaching assets | PASS | ## Requirements Coverage | Requirement Group | Count | Status | Evidence | |-------------------|-------|--------|----------| | BACK-01..BACK-05 | 5/5 | Satisfied | Phase 1 verification | | INT-01..INT-06 | 6/6 | Satisfied | Phase 2 verification | | MEM-01..MEM-05 | 5/5 | Satisfied | Phase 3 verification | | PROG-01..PROG-05 | 5/5 | Satisfied | Phase 4 verification | | ONTO-01..ONTO-04 | 4/4 | Satisfied | Phase 5 verification | | ASSET-01..ASSET-03 | 3/3 | Satisfied | Phase 6 verification | Total: 28/28 v1 requirements satisfied. ## Cross-Phase Integration | Flow | Result | Evidence | |------|--------|----------| | Diagnostic to learner memory to progression | PASS | Live smoke created a diagnostic session, submitted an answer, read learner memory, readiness map, and next challenge. | | Material ingestion to ontology to teaching asset prompt | PASS | Live smoke ingested material, read ontology candidates, and generated a source-backed teaching asset prompt. | | App wiring | PASS | `internal/app/server.go` wires workflow runner, interview service, learner memory, progression, ontology, and teaching assets into one HTTP handler. | | Typed workflow boundary | PASS | State-changing workflow outputs use Go structs and evidence references; handlers do not parse shell output. | | Source lineage | PASS | Ontology candidates and teaching asset prompts preserve source evidence and candidate review state. | | Image model guard | PASS | Teaching asset prompts store `model_key` and keep `requires_model_id_verification=true`. | ## End-to-End Smoke Evidence Latest audit smoke result: ```json { "SessionID": "diag-1", "AnswerGrade": "solid", "MemoryMastery": 1, "Readiness": 75, "ChallengeConcept": "http-idempotency", "MaterialID": "material-1", "OntologyConcepts": 4, "OntologyEdges": 3, "AssetPromptID": "asset-prompt-1", "AssetModelKey": "gpt-image-v2", "AssetRequiresVerification": true } ``` ## Validation Evidence - `go test ./...` passed. - `openspec validate bootstrap-job-tutor-platform --strict` passed. - Go source line-count check passed; no manually authored Go file exceeds 600 lines. - Git worktree was clean before the audit began. ## Requirement Cross-Reference Notes The requirement checklist and phase verification reports agree: every v1 requirement is marked complete and has a matching PASS entry in the relevant phase verification file. Phase summary files do not include YAML frontmatter with `requirements-completed`. This is not a product blocker because each summary has a matching verification report, but adding standardized summary frontmatter would make future automated audits cleaner. ## Nyquist Discovery No `*-VALIDATION.md` files were found for phases 1 through 6. This audit treats that as validation-process debt rather than a v1 product blocker because each phase already has a PASS verification report plus current tests and smoke coverage. ## Recommended Next Milestone Choose one of these as the next milestone: - Frontend MVP: build the web experience on top of the completed backend flow. - Persistence: replace in-memory stores with durable storage and migration boundaries. - Real workflow runtime: connect the typed runner boundary to third-one and internalized agent-farm workflow execution. - Document parser integration: add PDF/PPT/slide/document ingestion before richer ontology work.