docs: audit v1 milestone

This commit is contained in:
user
2026-04-26 18:00:59 +09:00
parent 156daa9087
commit 4bb1d07f94
2 changed files with 171 additions and 4 deletions

View File

@@ -7,7 +7,7 @@ See: `.planning/PROJECT.md` (updated 2026-04-26)
**Core value:** The user should feel and prove that they are becoming more
interview-ready after each short practice loop.
**Current focus:** v1 baseline complete; ready for milestone audit or frontend planning.
**Current focus:** v1 milestone audited; ready to choose the next milestone.
## Current Decisions
@@ -33,14 +33,17 @@ interview-ready after each short practice loop.
source-backed candidate concepts, prerequisite edges, and candidate gaps.
- Phase 6 teaching asset prompts are implemented and verified with source
evidence, model config, review state, and model-id verification guard.
- v1 milestone audit completed with all 28/28 requirements satisfied and
tech-debt items recorded in `.planning/v1-MILESTONE-AUDIT.md`.
## Next Actions
1. Run a milestone audit across Phase 1 through Phase 6.
2. Choose the next milestone: frontend MVP, persistence, real workflow runtime,
1. Choose the next milestone: frontend MVP, persistence, real workflow runtime,
or document parser integration.
3. Verify the production OpenAI image model identifier before real image
2. Verify the production OpenAI image model identifier before real image
generation calls.
3. Add standardized SUMMARY frontmatter or Nyquist validation files if future
GSD automation should enforce those gates.
## Validation Log
@@ -66,6 +69,10 @@ interview-ready after each short practice loop.
- 2026-04-26: Phase 6 implementation verified with `go test ./...`,
`openspec validate bootstrap-job-tutor-platform --strict`, live
material-to-asset-prompt smoke, and Go source line-count check.
- 2026-04-26: v1 milestone audit verified 28/28 requirements, cross-phase
integration, E2E diagnostic/progression and material/asset flows. Audit
status is `tech_debt` because MVP storage, real workflow runtime, parsers,
real image generation, and Nyquist validation artifacts remain deferred.
---
*State initialized: 2026-04-26.*

View File

@@ -0,0 +1,160 @@
---
milestone: v1
audited: 2026-04-26
status: tech_debt
scores:
requirements: 28/28
phases: 6/6
integration: 6/6
flows: 2/2
gaps:
requirements: []
integration: []
flows: []
tech_debt:
- phase: "001-go-backend-foundation-and-workflow-boundary"
items:
- "Workflow runner is still a deterministic stub; real third-one/agent-farm runtime is deferred."
- "Persistence, auth, frontend, ontology, and asset generation were deferred from the foundation phase."
- phase: "002-diagnostic-interview-loop"
items:
- "Diagnostic sessions are in-memory and lost on process restart."
- "Real third-one grading calls are deferred."
- phase: "003-learner-memory"
items:
- "Learner memory is in-memory."
- "Memory decay, ranking, and repeated-mistake clustering are deferred."
- phase: "004-progression"
items:
- "Readiness history, campaign state, and streak persistence are deferred."
- "Boss unlocks use simple stable-count logic rather than a richer concept cluster graph."
- phase: "005-ontology-materials"
items:
- "Material ingestion accepts JSON text only; multipart/PDF/PPT parsing is deferred."
- "Ontology analyzer is deterministic and shallow."
- "Human review and graph database persistence are deferred."
- phase: "006-teaching-assets"
items:
- "Prompt candidates are generated, but real image generation is deferred."
- "gpt-image-v2 is a product config key; actual provider model id must be verified before production calls."
- "Binary asset storage and slide/PPT export are deferred."
nyquist:
compliant_phases: []
partial_phases: []
missing_phases:
- "001-go-backend-foundation-and-workflow-boundary"
- "002-diagnostic-interview-loop"
- "003-learner-memory"
- "004-progression"
- "005-ontology-materials"
- "006-teaching-assets"
overall: missing
---
# v1 Milestone Audit
## Verdict
TECH_DEBT
All v1 functional requirements are satisfied and all phase verification reports
are PASS. No critical requirement, integration, or end-to-end flow blocker was
found.
The milestone should still be treated as a tech-debt review before archival
because the v1 backend is intentionally MVP-scoped: in-memory stores, stubbed
workflow execution, shallow deterministic ontology extraction, and prompt-only
teaching assets.
## Scope
| Phase | Name | Verification |
|-------|------|--------------|
| 1 | Go backend foundation and workflow boundary | PASS |
| 2 | Diagnostic interview loop | PASS |
| 3 | Learner memory | PASS |
| 4 | Progression | PASS |
| 5 | Ontology and learning materials | PASS |
| 6 | Teaching assets | PASS |
## Requirements Coverage
| Requirement Group | Count | Status | Evidence |
|-------------------|-------|--------|----------|
| BACK-01..BACK-05 | 5/5 | Satisfied | Phase 1 verification |
| INT-01..INT-06 | 6/6 | Satisfied | Phase 2 verification |
| MEM-01..MEM-05 | 5/5 | Satisfied | Phase 3 verification |
| PROG-01..PROG-05 | 5/5 | Satisfied | Phase 4 verification |
| ONTO-01..ONTO-04 | 4/4 | Satisfied | Phase 5 verification |
| ASSET-01..ASSET-03 | 3/3 | Satisfied | Phase 6 verification |
Total: 28/28 v1 requirements satisfied.
## Cross-Phase Integration
| Flow | Result | Evidence |
|------|--------|----------|
| Diagnostic to learner memory to progression | PASS | Live smoke created a diagnostic session, submitted an answer, read learner memory, readiness map, and next challenge. |
| Material ingestion to ontology to teaching asset prompt | PASS | Live smoke ingested material, read ontology candidates, and generated a source-backed teaching asset prompt. |
| App wiring | PASS | `internal/app/server.go` wires workflow runner, interview service, learner memory, progression, ontology, and teaching assets into one HTTP handler. |
| Typed workflow boundary | PASS | State-changing workflow outputs use Go structs and evidence references; handlers do not parse shell output. |
| Source lineage | PASS | Ontology candidates and teaching asset prompts preserve source evidence and candidate review state. |
| Image model guard | PASS | Teaching asset prompts store `model_key` and keep `requires_model_id_verification=true`. |
## End-to-End Smoke Evidence
Latest audit smoke result:
```json
{
"SessionID": "diag-1",
"AnswerGrade": "solid",
"MemoryMastery": 1,
"Readiness": 75,
"ChallengeConcept": "http-idempotency",
"MaterialID": "material-1",
"OntologyConcepts": 4,
"OntologyEdges": 3,
"AssetPromptID": "asset-prompt-1",
"AssetModelKey": "gpt-image-v2",
"AssetRequiresVerification": true
}
```
## Validation Evidence
- `go test ./...` passed.
- `openspec validate bootstrap-job-tutor-platform --strict` passed.
- Go source line-count check passed; no manually authored Go file exceeds 600
lines.
- Git worktree was clean before the audit began.
## Requirement Cross-Reference Notes
The requirement checklist and phase verification reports agree: every v1
requirement is marked complete and has a matching PASS entry in the relevant
phase verification file.
Phase summary files do not include YAML frontmatter with
`requirements-completed`. This is not a product blocker because each summary has
a matching verification report, but adding standardized summary frontmatter
would make future automated audits cleaner.
## Nyquist Discovery
No `*-VALIDATION.md` files were found for phases 1 through 6. This audit treats
that as validation-process debt rather than a v1 product blocker because each
phase already has a PASS verification report plus current tests and smoke
coverage.
## Recommended Next Milestone
Choose one of these as the next milestone:
- Frontend MVP: build the web experience on top of the completed backend flow.
- Persistence: replace in-memory stores with durable storage and migration
boundaries.
- Real workflow runtime: connect the typed runner boundary to third-one and
internalized agent-farm workflow execution.
- Document parser integration: add PDF/PPT/slide/document ingestion before
richer ontology work.