Files

29 lines
861 B
Markdown
Raw Permalink Normal View History

2026-04-26 18:52:16 +09:00
# Phase 9 Context: Material and Asset Workspace
**Status:** Ready for execution
**Started:** 2026-04-26
## Goal
Expose material ingestion, ontology inspection, and teaching asset prompt
candidate generation in the web app.
## Requirements
- WEB-05: Operator can ingest source material from the web app.
- WEB-06: Operator can inspect ontology candidate concepts, edges, and gaps.
- WEB-07: Operator can generate and inspect teaching asset prompt candidates.
- WEB-08: Web UI includes loading, empty, and error states for the MVP flows.
## UX Direction
Keep content operations as a secondary workspace below the diagnostic answer
surface. The operator flow should show provenance and candidate status without
turning the page into an admin dashboard.
## Out of Scope
- Full ontology editor.
- Human review promotion controls.
- Actual image generation.